Carpinteria Creek Bailard Stream Bank Restoration

As it was unpermitted, the concrete rubble fill was required to be removed and the bank reconstructed to native condition by the Department of Fish and Game as well as other government agencies.

PLC removed the concrete and debris and recycled the excavated material by crushing it into road base. All steel was sent for recycling, and wood debris was ground into compost. The bank was rebuilt using suitable soil and revegetated with native plants.